EOS Scoop Highly Commended Title for Wimbledon Court 1 at Offsite Awards

EOS are proud to announce we scooped the highly commended title in the ‘Best Use of Steel’ for our involvement with Wimbledon Court 1 project at this weeks Offsite Awards.

This prestigious project enabled EOS to demonstrate our extensive design capabilities, providing two walls (inner and outer) to envelope the entire circumference of Court 1 and integral to hiding the new structural elements of the open/closing roofing system.

EOS delivered a fully inclusive service of design, supply and scheduling. The design included a range of features such as; bespoke and highly resilient wind posts, bracketry stiffened with bespoke elements and tall cantilevered solutions. The design was produced using a full BIM Level 2 modelling and design package with
all manufacture data being taken from the BIM model. The scope of supply included all ancillary parts and fixings.

To view our case study for Wimbledon Court 1 click here

If you would like to discuss your project requirements contact enquiries@eosuk.org

Share on Google+Share on FacebookTweet about this on TwitterShare on LinkedInShare on RedditEmail this to someone
Download PDF

Heighington Lane, Aycliffe Industrial Park,
Newton Aycliffe, County Durham DL5 6QG
01325 303030

Join Our Mailing List: